NYC Local Law 11: Cycle 10 Filing Windows, Inspections and the 90-Day Repair Rule
New York City’s Facade Inspection and Safety Program (FISP), commonly called Local Law 11, requires owners of covered buildings higher than six stories to arrange periodic exterior-wall inspections and file a technical report. Cycle 10 runs from February 21, 2025 through February 20, 2030. A building’s designated sub-cycle determines its filing window; it is not one deadline for every property.
How the Cycle 10 windows work
The last digit of the building’s block number determines its sub-cycle. Sub-cycle 10A covers block endings 4, 5, 6 and 9, with a filing window from February 21, 2025 through February 21, 2027. Sub-cycle 10B covers block endings 0, 7 and 8, with a window from February 21, 2026 through February 21, 2028. Sub-cycle 10C covers block endings 1, 2 and 3, with a window from February 21, 2027 through February 21, 2029. Owners should confirm that their property is subject to FISP and verify the current DOB record and filing status before planning work.
Who performs the FISP examination?
The critical examination and technical report must be completed by a DOB-approved Qualified Exterior Wall Inspector (QEWI), who is a qualified New York State-licensed professional engineer or registered architect. A restoration contractor can perform repair work under the appropriate plans, permits and professional direction, but the contractor does not replace the QEWI or file the technical report on the owner’s behalf unless separately qualified and engaged to do so.
What does the 90-day rule mean?
The 90-day period concerns unsafe conditions identified in a filed report. Owners must immediately follow the QEWI’s public-protection recommendations, such as a sidewalk shed or other approved protection. Unsafe conditions generally must be corrected within 90 days of filing the technical report. If work cannot be completed in time, the QEWI must submit the required extension request. After repairs are complete, an amended report must be filed within two weeks. The precise filing, protection and extension requirements depend on the building’s circumstances and DOB rules.
Planning façade repairs
Common FISP-related scopes include brick replacement and repointing, lintel repair or replacement, parapet and coping work, concrete repair, sealant replacement and waterproofing. A careful project plan starts with the QEWI’s condition map and repair recommendations. The owner, design professional and contractor then coordinate access, pedestrian protection, permits, sequencing, materials and occupied-building needs. Photographs and repair records help document completed work for the design professional’s review.
NYC Skyline Restoration works on exterior restoration scopes across New York City, including masonry, parapets, lintels and waterproofing. We can review the repair scope with the owner’s design team and provide a written proposal for the construction work. Contact us at 917-640-9049 to discuss a façade restoration project.
This article is general information, not a determination that a particular property is subject to FISP or legal advice. Confirm building-specific requirements and deadlines with the NYC Department of Buildings and the building’s QEWI.